Project Size

1.2 MWp

PPA Term

20 years

Location

Binh Duong

/

Project Size

1.2 MWp

PPA Term

20 years

Location

Binh Duong

Sector
COD
Textile & Garment
2020
CO2 reduction (tonnes/ year)
Money savings to roof owner with SkyX over system life
1,454
> 6.24 million USD
37,391
Waste recycled instead of landfilled ( tonnes)
507

Other Projects

TADT - Stroman
Tân Á Đại Thành - Stroman
Location: Hưng Yên
Capacity: 1.2 MWp
TADT - Stroman
Tan A Dai Thanh - Stroman
Location: Hung Yen
Capacity: 1.2 MWp
1_MBVA
Tan A Dai Thanh
Location: Hà Nam
Capacity: 1.4 MWp
1_MBVA
Tan A Dai Thanh
Location: Ha Nam
Capacity: 1.4 MWp
LMAT
Location:
Capacity:
DCIM100MEDIADJI_0434
LMAT
Location: Bình Dương
Capacity: 1 MWp
Scroll to Top