Project Size

9MW

PPA Term

Location

/

Project Size

9MW

PPA Term

Location

Sector
COD
2022
CO2 reduction (tonnes/ year)
Money savings to roof owner with SkyX over system life
Waste recycled instead of landfilled ( tonnes)

Other Projects

test
Location:
Capacity: 9MW
TADT - Stroman
Tan A Dai Thanh 3 - Stroman
Location: Hung Yen
Capacity: 1.2 MWp
1_MBVA
Tan A Dai Thanh
Location: Ha Nam
Capacity: 1.4 MWp
LMAT
Location:
Capacity:
DCIM100MEDIADJI_0434
LMAT
Location: Binh Duong
Capacity: 1 MWp
Anh-hoat-dong
Abipha
Location: Ha Noi
Capacity: 1 MWp
Scroll to Top