An Phat
Project Size
8.2 MWp
PPA Term
20 years
Location
Hai Duong
/
Project Size
8.2 MWp
PPA Term
20 years
Location
Hai Duong
- Sector
- Plastic packaging
- COD
- 2020
- CO2 reduction (tonnes/ year)
- 9,938
- Trees planted (10 years)
- 255,503
- Waste recycled instead of landfilled ( tonnes)
- 9,938
- Money savings to roof owner with SkyX over system life
- > 42.64 million USD
Sector
COD
Plastic packaging
2020
CO2 reduction
(tonnes/ year)
Money savings to roof owner with SkyX over system life
9,938
> 42.64 million USD
255,503
Waste recycled instead of landfilled ( tonnes)
3,463
Other Projects
Tan A Dai Thanh - Stroman
Location:
Hung Yen
Capacity:
1.2 MWp
Tan A Dai Thanh
Location:
Ha Nam
Capacity:
1.4 MWp
LMAT
Location:
Binh Duong
Capacity:
1 MWp
Abipha
Location:
Ha Noi
Capacity:
1 MWp
Panko Quang Nam
Location:
Quang Nam
Capacity:
2 MWp
Fulin
Location:
Hai Phong
Capacity:
1.8 MWp
No posts found