Project Size

2.1 MWp

PPA Term

25 years

Location

Binh Duong

/

Project Size

2.1 MWp

PPA Term

25 years

Location

Binh Duong

Sector
COD
F&B
2020
CO2 reduction (tonnes/ year)
Money savings to roof owner with SkyX over system life
2,545
> 10.92 million USD
65,434
Waste recycled instead of landfilled ( tonnes)
887

Other Projects

TADT Hung Yen
Tan A Dai Thanh - Stroman
Location: Hung Yen
Capacity: 1.2 MWp
1_MBVA
Tan A Dai Thanh
Location: Ha Nam
Capacity: 1.4 MWp
DCIM100MEDIADJI_0434
LMAT
Location: Binh Duong
Capacity: 1 MWp
Anh-hoat-dong
Abipha
Location: Ha Noi
Capacity: 1 MWp
panko-tam-thang2
Panko Quang Nam
Location: Quang Nam
Capacity: 2 MWp
Fulin 1
Fulin
Location: Hai Phong
Capacity: 1.8 MWp