Project Size

0.7 MWp

PPA Term

20 years

Location

Long An

/

Project Size

0.7 MWp

PPA Term

20 years

Location

Long An

Sector
COD
Plastic manufacturing
2021
CO2 reduction (tonnes/ year)
Money savings to roof owner with SkyX over system life
848
> 3.64 million USD
21,811
Waste recycled instead of landfilled ( tonnes)
296

Other Projects

TADT - Stroman
Tan A Dai Thanh - Stroman
Location: Hung Yen
Capacity: 1.2 MWp
1_MBVA
Tan A Dai Thanh
Location: Ha Nam
Capacity: 1.4 MWp
DCIM100MEDIADJI_0434
LMAT
Location: Binh Duong
Capacity: 1 MWp
Anh-hoat-dong
Abipha
Location: Ha Noi
Capacity: 1 MWp
panko-tam-thang2
Panko Quang Nam
Location: Quang Nam
Capacity: 2 MWp
Fulin 1
Fulin
Location: Hai Phong
Capacity: 1.8 MWp