info@skyxsolar.com
YC Tec Vina
Project Size
1.2 MWp
PPA Term
23 years
Location
Binh Duong
/
Project Size
1.2 MWp
PPA Term
23 years
Location
Binh Duong
- Sector
- Electronic devices
- COD
- 2023
- CO2 reduction (tonnes/ year)
- 1,333
- Trees planted (10 years)
- 34,275
- Waste recycled instead of landfilled ( tonnes)
- 1,333
- Money savings to roof owner with SkyX over system life
- > 5.72 million USD
Sector
COD
Electronic devices
2023
CO2 reduction
(tonnes/ year)
Money savings to roof owner with SkyX over system life
1,333
> 5.72 million USD
34,275
Waste recycled instead of landfilled ( tonnes)
465
Other Projects
Tan A Dai Thanh - Stroman
Location:
Hung Yen
Capacity:
1.2 MWp
Tan A Dai Thanh
Location:
Ha Nam
Capacity:
1.4 MWp
LMAT
Location:
Binh Duong
Capacity:
1 MWp
Abipha
Location:
Ha Noi
Capacity:
1 MWp
Panko Quang Nam
Location:
Quang Nam
Capacity:
2 MWp
Fulin
Location:
Hai Phong
Capacity:
1.8 MWp
No posts found