Project Size

0.4 MWp

PPA Term

22 years

Location

Dak Lak

/

Project Size

0.4 MWp

PPA Term

22 years

Location

Dak Lak

Sector
COD
Hospitality
2023
CO2 reduction (tonnes/ year)
Money savings to roof owner with SkyX over system life
485
> 2.08 million USD
12,464
Waste recycled instead of landfilled ( tonnes)
169

Other Projects

TADT - Stroman
Tan A Dai Thanh 3 (Stroman)
Location: Hung Yen
Capacity: 1.2 MWp
1_MBVA
Tan A Dai Thanh 1
Location: Ninh Binh
Capacity: 1.4 MWp
DCIM100MEDIADJI_0434
LMAT
Location: Ho Chi Minh City
Capacity: 1 MWp
Anh-hoat-dong
Abipha
Location: Ha Noi
Capacity: 1 MWp
panko-tam-thang2
Panko Tam Thang
Location: Da Nang
Capacity: 2 MWp
Fulin 1
Fulin
Location: Hai Phong
Capacity: 1 MWp
Scroll to Top